At the meeting, the decision sounds simple: the building needs painting. The trouble starts when the quotes arrive. One says ‘exterior painting’, another includes repairs and a third leaves the scaffolding for later. Three totals don’t necessarily give you three comparable offers.
The conversation starts before you ask for a price. Everyone needs the same description of the work, a record of the building’s condition and a clear scope. Owners can then decide what they are paying for, and the contractor can explain what they are taking on. The lowest total may simply cover less work.
Start by recording the surfaces and their condition
Divide the building into specific areas: façades, parapets, balcony ceilings, stairwell, entrance and railings. Mark what’s included and what’s excluded. Ask how quantities were measured and how openings, recesses and awkward areas have been accounted for. Photographs with numbered locations help everyone discuss the same work.
Loose surfaces, cracks and signs of damp need assessing before they are covered. If serious damage, reinforcement corrosion or water ingress is suspected, bring in a qualified professional first. A fresh coat of paint doesn’t establish that the underlying cause has been addressed. Ask for a separate description of the investigation and any repairs it identifies.
The name of the paint is only part of the specification
The quote should identify the products and describe how they will be used. Which primer is proposed, on what surface, with what preparation and which final coat? Ask for the technical data sheets for the products specified. A phrase like ‘high-quality acrylic’ doesn’t give you enough to sign the work off.
For example, the Vitex exterior paint data sheet lists coverage per coat, time before recoating and application conditions separately. The sheet illustrates what information to ask for. It should not be read as a recommendation for this product or as a specification for every building. Each product comes with its own instructions and needs to be checked against the surface it will go on.
Access needs its own specification
Scaffolding or any other suitable access equipment should be described from the start. The Department of Labour Inspection notes that the relevant scaffolding work requires specific training, experience and supervision by a competent person. Residents do not have to design the equipment themselves. They need to know who will organise the work safely and what is included in the agreement.
There is also daily life around the work: entrances, car parks, pedestrians, open windows, plants, awnings and outdoor air-conditioning units. Protecting other people is part of organising the job. Ask how residents will be informed and who they can contact on days when access is affected.
| Quote item | What it should clarify |
|---|---|
| Surfaces | Which façades and features are included, and how they are measured. |
| Preparation and repairs | The specific scope and how unexpected work will be approved. |
| Access and protection | Equipment, arrangements, coverings and reinstatement after removal. |
| Paint system | Products, application in line with data sheets, colour and a sample for approval. |
| Timing and payments | Phases, weather arrangements, payment milestones and taxes. |
| Handover | Outstanding work, cleaning, product documentation and warranty terms. |
Agree on extras before the work goes ahead
In an older building, problems can come to light after loose material has been removed. Agree on a written process for authorising extras. Ask for a photo of the issue, a technical explanation and a separate quote, then have the appropriate building body approve the additional work before it starts.
The warranty needs the same clarity. Who gives it, what does it cover and what is excluded? A product warranty and responsibility for applying the product are separate matters. Keep the data sheets, colour code, invoices and contractor details in the building’s records.
Sign off the work before closing the file
Inspect in daylight, draw up a list of corrections and confirm the agreed work is complete. The committee should also tell owners clearly what was approved, what changed and why. This guide gives no estimate of market prices. It gives owners a common basis for comparing the actual quotes their building receives.