Opalion: apartment-level pricing and a residential plan around a 520 sq m park

Housing

The 28 September price list, current availability and the construction update show different aspects of Askanis’s residential development.

Opalion: apartment-level pricing and a residential plan around a 520 sq m park

The key points

Askanis’s Opalion, on the boundary between Agios Athanasios and Mesa Geitonia, combines two residential buildings with 520 sq m of private landscaped green space. Choosing a unit, however, means examining the individual areas and amenities attached to each price.

The most recent published price list linked to the company’s update is dated 28 September 2026. It distinguishes internal area, covered veranda, total covered area and, where applicable, roof garden.

Four examples from the company’s table

UnitInternal areaCovered verandaAsking price excluding VAT
Block B · 103 · 2 bedrooms77.25 sq m14.70 sq m€367,000
Block A · 102 · 2 bedrooms80 sq m31.85 sq m€432,000
Block B · 301 · 2 bedrooms77.15 sq m21.10 sq m€454,000
Block A · 306 · 3 bedrooms103.70 sq m22.45 sq m€592,000

The last two units have separate roof gardens of 45 and 61 sq m respectively. These examples show why homes with similar internal areas can offer different combinations of space and different prices.

The figures are asking prices from the published table, rather than recorded transactions. Actual availability and final terms must be confirmed with Askanis.

Shared space and specifications

The park is intended exclusively for residents and includes a planned playground. The company describes an A energy rating, photovoltaics and provision for vehicle charging for each unit. Underfloor heating is listed among the penthouses’ standard specifications; other upgrades are available as additional options.

What the construction update shows

On 8 September, the company reported completion of the thermal envelope in both buildings and waterproofing of Block A. External works were expected to finish in November, while the target for joinery was January 2027.

The price list and availability presentation carry different dates from the construction update. A more recent confirmation of progress is therefore needed.

PROPERTYMATTERS · CONTINUE READING

Related reporting and practical guides

Περισσότερες οπτικές.

Αγοράζεις θέα στη θάλασσα. Φτάνεις όμως μέχρι την παραλία;
Αρχιτεκτονική & ΖωήΑνάλυση

Αγοράζεις θέα στη θάλασσα. Φτάνεις όμως μέχρι την παραλία;

Η πραγματική αξία μιας παραθαλάσσιας κατοικίας φαίνεται και στη διαδρομή από την πόρτα μέχρι το νερό. Δημόσιοι περίπατοι, δικαιώματα διέλευσης και προσβασιμότητα συνθέτουν μια…

6′ ανάγνωση